Checking the Function


Testing period

  • For new systems, check every week during the 6 months following commissioning whether error messages have been logged. This will reveal any hidden errors in the installation or configuration.

  • For all other systems, check every 6 months whether error messages have been logged.

Procedure:

  1. Activate the user interface of the inverter Establishing a connection to the user interface).
  2. Log in as User Logging In and Out of the User Interface).
  3. Select the menu Events.
  4. Set filter. Activate Warning and Error. Deactivate Information.
  5. Set the desired time period and select [Apply time filter].
  6. If error messages have been logged, eliminate the cause Event messages).