Connecting the AC Power Cable
Qualified person
Always proceed as follows to connect the power cables.
Cable requirements:
Conductor type: copper wire
Recommended conductor cross-section: 10 mm²
Conductor cross-section: 1.5 mm² to 16 mm²
Cable diameters: 9 mm to 18 mm
WARNING
Danger to life from electric shock due to incorrect connection of the neutral conductor ins single systems and single-cluster systems
In single systems and single-cluster systems, the neutral conductor of the external energy source is firmly connected to the neutral conductor of the Sunny Island inverter on connection AC2 Gen/Grid N. Upon disconnection of the external energy source, the Sunny Island only disconnects the line conductor on connection AC2 Gen/Grid N. The Sunny Island disconnects all poles from the external energy source on connection AC2 Gen/Grid NTT. If the neutral conductor is incorrectly connected on connection AC2, the protective functions in the system can fail. This can result in death or serious injury.
- Always connect the neutral conductor to the connection AC2 Gen/Grid NTT in systems for increased self-consumption.
- Always connect the neutral conductor to the connection AC2 Gen/Grid NTT in battery backup systems.
- Always connect the neutral conductor of the generator to the connection AC2 Gen/Grid N in off-grid systems.
CAUTION
Danger of crushing when locking levers snap shut
The locking levers close by snapping down fast and hard.
- Press the locking levers of the terminal block for the AC cable down with your thumb only.
- Do not grip the entire terminal block for the AC cable.
- Do not place your fingers under the locking levers.
Procedure:
- Move the levers of the terminals upward at AC1 or AC2.
- When connecting the cable to connection AC1, attach the M25 cable gland to the AC1 enclosure opening using the counter nut (torque: 7 Nm).
- When connecting the cable to connection AC2, attach the M25 cable gland to the AC2 enclosure opening using the counter nut (torque: 7 Nm).
- Remove the cable jacket and strip off 13 mm of the the insulation of all conductors.
- Lead the cable through the cable gland into the Sunny Island.
- Connect the insulated conductors to AC1 Loads/SunnyBoys or AC2 Gen/Grid. Insert the neutral conductor as far as it will go into terminal N or NTT and push the lever down.
- Insert the line conductor as far as it will go into terminal L and push the lever down.
- Connect the grounding conductor ( > Connecting the Grounding Conductor).
- Ensure that the seal insert is positioned correctly in the cable gland.
- Tighten the swivel nut of the cable gland (torque: 4 Nm).