Commissioning Procedure


This section describes the procedure for commissioning the SMA Home Storage.

It provides an overview of the steps, which must be performed in the prescribed sequence.

Procedure

See

Check that all installed components have been correctly mounted and connected.

Checking the Mounting and Connection Work)

If there is an SMA Home Manager installed, commission the SMA Home Manager.

Manual of the SMA Home Manager

Put the inverter into operation and check for the latest firmware.

Manual of the inverter

Start the commissioning of the battery modules.

Commissioning the battery modules)

Establish a connection to the user interface of the inverter.

Manual of the inverter

Log into the user interface and configure the system.

Manual of the inverter

Check the configuration of the battery modules.

Checking the configuration of the battery modules on the user interface of the inverter)