Possible system concepts and their reference points


The unit and component certification ensures the fulfillment of the individual functions and requirements for each component. The interaction and compliance at the system level can be implemented in different ways. Thus, prioritization can take place either only in the system controller, only in the inverter or, if the functions are implemented in different components, also in the system controller and inverter. Note that the overall system must satisfy the requirements.

In general, the systems used are equipped with a system controller according to VDE AR-N 4110 and VDE AR-N 4120, which can process and prioritize the specifications of the grid operator and direct seller.

There are two applications for PV and storage systems:

  • Full feed-in PV system

  • Mixing system (e.g. self-consumption system)

    • Loads available and/or

    • Various energy types present (hybrid, e.g. via PV and battery)

The fundamental difference lies in the fact that in a full feed-in PV system, all functions can be fulfilled with reference to the point of interconnection (POI), whereas in a mixing system, the different reference points point of interconnection (POI) and generation unit (GU) must be taken into account. The following table provides an overview of the requirements:

Function

Reference point in full feed-in PV system

Reference point in mixing system

GSM active power setpoint (with redispatch)

Point of interconnection or generation unit (no significant control deviation present)

Generation Unit

P(f) function

Generation Unit

DV active power setpoint

Usually, point of interconnection provided, possibly generation unit possible

Possibly PAV,E monitoring

Grid connection point

Grid connection point