Operation
- Establishing a connection to the user interface
- Logging In and Out of the User Interface
- Start Page Design of the User Interface
- Displaying and Downloading the Stored Data
- Starting the Installation Assistant
- Secure power supply operation
- Checking or Disabling Battery-Backup Operation
- Activate WPS Function
- Switching WLAN On and Off
- Changing the Password
- Changing Operating Parameters
- Configuring the Country Data Set
- Configuring the Active Power Mode
- Configuring Battery and Automatic Transfer Switching Device
- Disabling Battery Charging by PV System in Battery-Backup Operation Mode
- Configuring the Modbus Function
- Activating the Receipt of Control Signals (Only for Italy)
- Deactivating Grounding Conductor Monitoring
- Configuring the Energy Meter
- Saving the Configuration in a File
- Adopting a Configuration from a File
- Firmware Update