Operating Manual
SUNNY BOY SMART ENERGY 3.8-US / 4.8-US / 5.8-US / 7.7-US / 9.6-US / 11.5-US
- Information on this Document
- Safety
- Scope of Delivery
- Product overview
- Device function of Sunny Boy Smart Energy
- Product Description
- Symbols on the Product
- Interfaces and Functions
- User Interface
- Device Key (DEV KEY)
- Diagnostic function
- Increased self-consumption
- Energy Monitoring
- Peak load shaving
- Arc-Fault Circuit Interrupter (AFCI)
- Modbus
- Grid Management Services
- Rapid Shutdown Equipment
- SMA Backup Secure
- SMA Dynamic Power Control
- SMA ShadeFix
- SMA Smart Connected
- SMA Speedwire
- Protective Battery Charging
- Wi-Fi
- Wi-Fi connection to SMA 360° app and SMA Energy app
- User Interface
- LED Signals
- Device function of Sunny Boy Smart Energy
- Mounting
- Electrical Connection
- Requirements for the electrical connection
- Equipotential Bonding
- Overvoltage category
- Common Grid Configurations
- Requirements for the PV modules per input
- Cable Requirements
- Requirements for the AC Grounding Conductor
- Requirements on the AC conductors
- Requirements for the PV Grounding Conductors
- Requirements for the PV cables
- Requirements for the power cable for secure power supply operation
- Requirements for signal cables for backup operation, MFR and rapid shutdown initiator
- Network cable requirements
- Cable specifications for RS485 connection of the energy meter
- Battery Communication Cable Requirements
- Requirements for the Battery Power Cables
- Requirements for the grounding cable for additional protective grounding
- Equipotential Bonding
- Overview of the Connection Area
- Electrical connection procedure
- Connecting the Utility Grid
- Connect the utility grid along with power and signal cables for backup operation
- Connecting the Network Cable for Local Network and Energy Meter
- Connection to RS485 terminal
- Connecting the Data Cable of the Battery
- Connection to the Multifunction Relay
- Connecting a Rapid Shutdown Initiator
- Mounting the WLAN Antenna
- Connecting the PV Array
- Connecting the power cable of the battery
- Connecting additional protective grounding
- Requirements for the electrical connection
- Commissioning
- Operation
- Operation notes
- Establishing a Connection to the User Interface
- WPS function
- Design of the User Interface
- Access rights to the user interface
- Changing parameters
- Arc-Fault Circuit Interrupter (AFCI)
- Rapid shutdown function
- Setting backup operation
- Setting of SMA ShadeFix
- Control of external devices via Modbus
- Digital output (MFR)
- Energy management
- Backup file
- Firmware Update
- Device Administration
- Restart the inverter via the user interface
- Resetting the product to default setting
- Deleting the Admin Account
- Generating the I-V Characteristic Curve
- Enabling Speedwire Encryption
- Country standard
- Overview of Grid Types
- Operation notes
- Disconnecting the Inverter from Voltage Sources
- Cleaning
- Troubleshooting
- Event messages
- Event 101
- Event 102
- Event 103
- Event 105
- Event 202
- Event 203
- Event 206
- Event 301
- Event 302
- Event 401
- Event 404
- Event 501
- Event 507
- Event 601
- Event 701
- Event 901
- Event 1001
- Event 1101
- Event 1302
- Event 1501
- Event 3302
- Event 3303
- Event 3401
- Event 3402
- Event 3407
- Event 3410
- Event 3411
- Event 3501
- Event 3523
- Event 3601
- Event 3701
- Event 3901
- Event 3902
- Event 4013
- Event 4014
- Event 4015
- Event 4016
- Event 4017
- Event 4301
- Event 6001-6499
- Event 6501
- Event 6502
- Event 6509
- Event 6511
- Event 6512
- Event 6602
- Event 6606
- Event 6633
- Event 6801
- Event 6901
- Event 7001
- Event 7002
- Event 7014
- Event 7015
- Event 7702
- Event 7703
- Event 8003
- Event 8104
- Event 8205
- Event 8503
- Event 8708
- Event 8709
- Event 8710
- Event 9007
- Event 9033
- Event 9034
- Event 9035
- Event 9037
- Event 9038
- Event 9101
- Event 9107
- Event 9202
- Event 9203
- Event 9214
- Event 9342
- Event 9345
- Event 9350
- Event 9394
- Event 9395
- Event 29252
- Event 29254
- Event 101
- Create Diagnostics Data
- Calculating the insulation resistance
- Checking the PV System for Ground Faults
- Manual restart after electric arc
- Event messages
- Decommissioning
- Replacing the Product
- Disposal
- Technical Data
- Compliance Information
- Contact