Electrical connection procedure


This section describes the procedure for the electrical connection of the product. It provides an overview of the steps, which must be performed in the prescribed sequence.

Procedure

See

Ensure that the requirements for the electrical connection are fulfilled.

Requirements for the electrical connection)

Remove the lid.

Remove enclosure lid)

Disconnect the inverter from voltage sources.

Optional: Install SMA Backup Start

Install SMA Backup Start

Connect the AC conductors.

Optionally together with cables for backup operation: Connect the utility grid along with power and signal cables for backup operation)

Connect the network cables.

Optional: Connect the energy meter via RS485

Connecting the energy meter via RS485)

Optional: Connect the battery communication cable.

Optional: Connect signal source to MFR

Connection to the Multifunction Relay)

Optional: Connecting a Rapid Shutdown Initiator to the Digital Input GSI

Connecting a Rapid Shutdown Initiator)

Connect the PV modules.

Optional: Connect the battery power cable.

    Also see: