Deactivating the Webconnect Function


Requirements:

  • The PV system must be commissioned Commissioning the PV System).
  • A computer with an Ethernet interface must be available.
  • Sunny Explorer from software version 1.06 must be installed on the computer.

Procedure:

  1. Access the Sunny Explorer user interface.
  2. Under Settings > External Communication, select the parameter Webconnect functionality switched on and set to No.
  3. Save settings.