Checking the Mounting and Connection Work


Before commissioning or during setup, perform a thorough check of all mounting and connection work.

Requirement:

  • Ensure that the battery has been correctly mounted and connected.

    Procedure:

    1. Measure the ground resistance and continuity of the grounding conductor.
    2. Measure the insulation resistance.
    3. Check the polarity between the inverter and battery.