Checking the Mounting and Connection Work
Before commissioning or during setup, perform a thorough check of all mounting and connection work.
Requirement:
- Ensure that the battery has been correctly mounted and connected.
Procedure:
- Measure the ground resistance and continuity of the grounding conductor.
- Measure the insulation resistance.
- Check the polarity between the inverter and battery.