Commissioning Procedure


The entire system can be configured with the SMA 360° app following the connection of the individual components. SMA Solar Technology AG recommends using the SMA 360° App to configure the system.

Procedure

See

Check that all installed components have been correctly mounted and connected.

Checking the Mounting and Connection Work

Connect and switch on all devices in the system (e.g. inverter, energy meter, battery).

See operating manual for the products ( > Switching on the Battery)

Configure the inverter that is to become the System Manager using the commissioning wizard of the SMA 360° app.

( > Configuring the System with the SMA 360° App)

Checking the Battery Configuration via the Inverter User Interface

( > Checking the Battery Configuration via the Inverter User Interface)