Operating Procedure with Generators with Autostart Function
|
Event or state |
Result |
Internal transfer relay |
|---|---|---|
|
The generator management system requests the generator. |
The Sunny Island starts the generator. |
Open, the stand-alone grid is not connected to the generator. |
|
The generator starts. |
The generator voltage builds up. | |
|
The generator management system measures the time until the generator voltage is within the configured thresholds for voltage and frequency. If a maximum time is exceeded, the generator management system terminates the generator start. | ||
|
The generator voltage is within the configured thresholds for voltage and frequency. |
The generator management system starts the warm-up time. | |
|
The warm-up time is running. |
– | |
|
The warm-up time ends. |
The Sunny Island synchronizes the stand-alone grid with the generator voltage. | |
|
The stand-alone grid is synchronized. |
The Sunny Island connects the stand-alone grid to the generator. |
Closed, the stand-alone grid is connected to the generator. |
|
The stand-alone grid is connected to the generator. |
The generator feeds current into the stand-alone grid. | |
|
The generator management system starts the minimum run time. | ||
|
The minimum run time is running. |
Even if the generator management system no longer requests the generator, the stand-alone grid remains connected to the generator. | |
|
The minimum run time ends. |
If the generator management system continues to request the generator, the stand-alone grid remains connected to the generator. | |
|
The generator management system no longer requests the generator. |
The Sunny Island supplies the stand-alone grid and carries out load-free disconnection of the generator from the stand-alone grid. |
Open, the stand-alone grid is not connected to the generator. |
|
The generator management system starts the power-down time. | ||
|
The power-down time is running. |
During the power-down time, the generator management system cannot request the generator again and the Sunny Island cannot reconnect the stand-alone grid to the generator. | |
|
The power-down time ends. |
The Sunny Island stops the generator. | |
|
The generator management system starts the minimum stop time. | ||
|
The minimum stop time is running. |
The Sunny Island cannot start the generator. It is also not possible to perform a manual start at the Sunny Island. | |
|
The generator management system cannot request the generator. | ||
|
The minimum stop time ends. |
The generator management system can request the generator. | |
|
The generator can be started at the Sunny Island. |