Generator Management Tasks
The Sunny Island inverter generator management system performs the following tasks:
-
Requesting the generator in automatic generator operation.
-
Controlling the Sunny Island inverter for switching the stand-alone grid to the generator voltage.
-
Maintaining generator run times in order to prolong the generator service life.
-
Protecting the generator against overload and backfeed.
-
Controlling the switching operations in the Sunny Island for disconnecting the generator.
-
Making reactive power available for the generator.
The generator management system enables the use of generators that have a low output power in relation to the nominal load of the Sunny Island inverter (see the technical document "Sunny Island - Generator White Paper" at www.SMA-Solar.com).