Scope of Delivery
Check the scope of delivery for completeness and any externally visible damage. Contact your distributor if the scope of delivery is incomplete or damaged.
Sunny Boy

Components included in the scope of delivery of the inverter
Position |
Quantity |
Designation |
---|---|---|
A |
1 |
Inverter |
B |
1 |
Supplementary sheet for the inverter |
Sunny Multigate

Elements included in the scope of delivery of the Sunny Multigate
Position |
Quantity |
Designation |
---|---|---|
A |
1 |
Sunny Multigate |
B |
1 |
AC field plug: insulator, plug enclosure, seal, screw connection |
C |
1 |
Protective cap for unused AC pin connector on the last inverter* |
D |
1 |
Label with registration ID (RID) and identification key (PIC) for registration in Sunny Portal** |
E |
1 |
Installation manual for Sunny Boy and Sunny Multigate, mounting overview, supplementary sheet with default settings |
* Last inverter: The inverter that is located at the end of the PV system and not directly connected to the Sunny Multigate but only to one other inverter, is called the "last inverter" in this document. An AC pin connector remains unused on the last inverter and must be closed with a protective cap.
** Keep this label with your access data for registration in Sunny Portal. The access data can be found on the Sunny Multigate type label.
AC Cable and DC Plug

Components included in the scope of delivery of the AC cable and the DC plug
Position |
Quantity |
Designation |
---|---|---|
A |
1 |
AC cable with two connectors for connecting two inverters or for connecting the first inverter* to the AC field plug |
B |
1 |
DC plug with two DC connectors** |
* First inverter: The inverter that is located at the beginning of the PV system and is directly connected to the Sunny Multigate via the AC cable is called "first inverter" in this document.
** The DC connectors illustrated may deviate from your order.