Configuration Procedure
Once you have commissioned the PV system, you may have to adjust various settings via a communication product. This section describes the procedure for configuration and gives an overview of the steps you must perform in the prescribed order.
Procedure |
See | |
---|---|---|
|
If you want to integrate the PV system into a Speedwire network, connect the Sunny Multigate to the network. | |
|
To manage the PV system data or to set the operating parameters, capture the Sunny Multigate in a communication product. |
> Registering the Sunny Multigate in Sunny Portal and > Connecting the Sunny Multigate to Sunny Explorer |
|
Change the PV system time and PV system password. |
Manual of the communication product at www.SMA-Solar.com |
|
Check which country data set the Sunny Multigate is set to. |
Supplementary sheet with default settings |
|
If the country data set is not set correctly for your country or your purpose, adjust to the required country data set. |