Configuration Procedure


Once you have commissioned the PV system, you may have to adjust various settings via a communication product. This section describes the procedure for configuration and gives an overview of the steps you must perform in the prescribed order.

Procedure

See

If you want to integrate the PV system into a Speedwire network, connect the Sunny Multigate to the network.

Connecting the Sunny Multigate to the Network

To manage the PV system data or to set the operating parameters, capture the Sunny Multigate in a communication product.

Registering the Sunny Multigate in Sunny Portal and Connecting the Sunny Multigate to Sunny Explorer

Change the PV system time and PV system password.

Manual of the communication product at www.SMA-Solar.com

Check which country data set the Sunny Multigate is set to.

Supplementary sheet with default settings

If the country data set is not set correctly for your country or your purpose, adjust to the required country data set.

Configuring the Country Data Set