Mounting the Sunny Multigate on the Top-Hat Rail


Additionally required mounting material (not included in the scope of delivery):

  • Distribution box complying with the installation site requirements according to degree of protection IP20
  • Top-hat rail (DIN rail) suitable for the distribution box (width: 35 mm, length: 235 mm).

Procedure:

    856956940
  1. For mounting on a top-hat rail, attach the Sunny Multigate to the top-hat rail from above, and hook it in.
  2. The Sunny Multigate snaps into place.
  3. Make sure that the Sunny Multigate is securely in place.