Commissioning procedure with ennexOS


Qualified person

This section describes the procedure of commissioning an inverter that is used in systems without System Manager (e.g. SMA Data Manager).

It provides an overview of the steps, which must be performed in the prescribed sequence.

Procedure

See

Commission the inverter.

Commissioning the Inverter)

Establish a connection to the user interface of the inverter. There are various connection options to choose from for this:

  • Connection via WLAN in the local network

  • Direct connection via Ethernet

  • Connection via Ethernet in the local network

Establishing a connection to the user interface

Change the network configuration, if necessary. The automatic network configuration recommended by SMA Solar Technology AG via DHCP server is activated by default.

Changing the Network Configuration)

Carry out the configuration using the Commissioning Assistant. Make the following settings:

  • Administrator registration

  • Device configuration (device name, device function)

  • Adding devices (e.g. energy meter, PV inverter)

  • Country data set

  • Energy meter at the point of interconnection

  • Battery configuration

  • Energy management

  • Grid management services

Configuring the Inverter)

To monitor the PV system and visualize the PV system data, register in the Sunny Portal and create the system in Sunny Portal or add devices to an existing system.

https://www.sunnyportal.com