Disassembling the Inverter


Qualified person

To decommission the inverter completely upon completion of its service life, disassemble the inverter as described in the following.

Requirements:

  • All connections of the inverter are disconnected.

  • Original packaging or packaging suitable for the weight and dimensions of the inverter is available.

  • A pallet is available.

  • Mounting material for attaching the packaging on the pallet is available (e.g. tie-down straps).

  • All transport handles are in place.

Procedure:

    12078684684
  1. Screw the transport handles as far as they will go into the tapped holes on the right- and left-hand side until they lie flush with the enclosure. When doing so, ensure that the transport handles are screwed into the tapped holes so that they are perfectly straight. If the transport handles are not screwed in straight, this can make it more difficult or even impossible to unscrew them later on. The tapped holes may get damaged, thus making it difficult to mount the transport handles again.
  2. 12078685068
  3. Insert a screwdriver into the holes in the transport handle and turn the screwdriver through 90°. This ensures that the transport handles are securely tightened.
  4. If the product should be lifted from the mounting bracket with the help of a hoist, screw the eye bolts into the threads on the top of the product and attach the hoist to them. The hoist must be suitable for the weight of the product.
  5. 12078685452
  6. Unscrew the screw for securing the product to the mounting brackets on the right and left (TX40).
  7. 12078685836
  8. Remove the product from the mounting lugs of the mounting brackets by moving it upward.
  9. 12078686220
  10. Remove all 4 transport handles from the tapped holes. If necessary, insert a screwdriver into the holes on the transport handle and use the screwdriver to remove the transport handle.
  11. If the product should be stored or shipped: Package the product and the wall mounting bracket. To do this, use original packaging or packaging suitable for the weight and size of the product and secure the packaging to the pallet with tension straps.
  12. Dispose of the inverter, if necessary.

    Also see: