Commissioning the Inverter
Qualified person
WARNING
Danger to life due to fire or explosion when batteries are fully discharged
A fire may occur due to incorrect charging of fully discharged batteries. This can result in death or serious injury.
- Before commissioning the system, verify that the battery is not fully discharged.
- Do not commission the system if the battery is fully discharged.
- If the battery is fully discharged, contact the battery manufacturer for further proceedings.
- Only charge fully discharged batteries as instructed by the battery manufacturer.
Requirements:
-
The AC circuit breaker must be correctly rated and mounted.
-
The product must be correctly mounted.
-
All cables must be correctly connected.
Procedure:
- Switch on the AC circuit breaker.
- Switch on the battery or the load-break switch of the battery (see documentation of the battery manufacturer).
- All 3 LEDs light up briefly. The start-up phase begins.
- If th red LED is glowing, an error has occurred that must be rectified ( > Troubleshooting).
- Establish a connection to the user interface of the inverter ( > Establishing a connection to the user interface).