Installation Manual
SMA Backup 1P
BU-SBSE-1P-AU-50
- Information on this Document
- Safety
- Scope of Delivery
- Product overview
- Mounting
- Electrical Connection
- Removing the grounding conductor connection on the inverter
- Requirements for the electrical connection
- Enclosure opening
- Overview of the Connection Area
- Connecting the connections to the automatic transfer switching device
- Optional: Connecting residual-current device
- Optional: Connecting additional Energy Meter CT and additional miniature circuit breakers
- Placing a notice about backup operation on the meter cabinet
- Connection Area of the Inverter
- Removing the grounding conductor connection on the inverter
- Operation
- Closing the enclosure
- Troubleshooting
- Decommissioning the Product
- Disposal
- Technical Data
- Contact
