Optional: Prepare the enclosure
Qualified person
Holes for enclosure opening are already provided on the top and bottom of the enclosure of the automatic transfer switching device. If the automatic transfer switching device is to be mounted in a different location, for example to the right or left of the inverter, you have the option of adapting the enclosure to meet your requirements. Possible holes are marked on the right, left, top and bottom.
Procedure:
- Drill the required holes with a step drill. The holes must not be larger than the size marked on the enclosure. When drilling, make sure that no internal cables or components of the automatic transfer switching device are damaged. If necessary, remove components from the automatic transfer switching device before drilling.
- Remove drilling chips from the enclosure.
- Before installation, observe the minimum distance to the inverter (see product manual).