Enclosure opening

Position | Cable |
|---|---|
A | AC cable SPS IN and SPS OUT |
B | AC cable for the AC connection on the inverter |
C | AC cable for connection of backup loads |
D | AC cable for connection to the utility grid |

Position | Cable |
|---|---|
A | AC cable SPS IN and SPS OUT |
B | AC cable for the AC connection on the inverter |
C | AC cable for connection of backup loads |
D | AC cable for connection to the utility grid |