Commissioning Procedure


Qualified person

This section describes the commissioning procedure and gives an overview of the steps you must perform in the prescribed order.

Commissioning an inverter that is captured in a communication device

When the inverter is captured in a communication device, the communication device (e.g. SMA Data Manager) is the unit for configuring the total system. The configuration is transferred to all inverters in the system. The system password assigned via the communication device is also the password for the user interface of the inverter.

  1. Commission the inverter Commissioning the Inverter).
  2. The initial configuration of the inverter is made via the communication device. The configuration is transferred to the inverter and the settings of the inverter are overwritten.
  3. Deactivate the Webconnect function of the inverter via the Sunny Portal. This prevents unnecessary connection attempts of the inverter with Sunny Portal.

Procedure

See

Commission the inverter.

Commissioning the Inverter)

Establish a connection to the user interface of the product. There are various connection options to choose from for this:

  • Direct connection via WLAN

  • Connection via WLAN in the local network

  • Connection via Ethernet in the local network

Establishing a connection to the user interface)

Log into the user interface.

Logging In and Out of the User Interface)

Select the inverter configuration option. Please note that the SMA Grid Guard code for changing the grid-relevant parameters must be available after completion of the first ten feed-in hours or installation assistant. You can request the SMA Grid Guard code via the Online Service Center.

Selecting a configuration option)

Configure the product and set country data set. Then the product will begin operation.

Configuring the Country Data Set)

Make further inverter settings as needed.

Operation)