Options for creating a new system
These are the options for creating a system:
Creating a system (standard option)
This option is the standard option to register a completely new system and its devices in the portal.
Sunny Design project
Select this option if the system has already been planned in Sunny Design. The assistant incorporates some of the project data from the existing Sunny Design project, thereby reducing the amount of manual data entry required.
Data transfer from an existing Sunny Portal system
Select this option if a system already exists in the previous Sunny Portal and their energy and performance data are to be transferred.
With this option, data are only transferred if you create a new system with a new communication device compatible with ennexOS, e.g. when replacing a Sunny WebBox with an SMA Data Manager.
A system with an active Sunny WebBox can therefore not be moved to the ennexOS platform as it is not compatible.
Procedure:
Replace the data capture device in your system (e.g. Sunny WebBox or SMA Cluster Controller) with a compatible ennexOS device (e.g. SMA Data Manager or inverter with ennexOS System Manager function).
Commission the new ennexOS System Manager locally and register all existing devices in your system as subordinate devices.
Fully complete the local commissioning.
Create a new system in Sunny Portal and select the option "Data transfer from an existing Sunny Portal system".
Locate the appropriate system in Sunny Portal Classic using the system name.
Next, add the new ennexOS System Manager to the system with PIC and RID.
The historic energy and performance data of the devices and the system are then transmitted from the old portal system to the new system.
Moving an existing Sunny Portal system with Sunny Home Manager 2.0
Select this option if an existing system with a Sunny Home Manager 2.0 is to be completely transferred to Sunny Portal powered by ennexOS.
Unlike a simple data transfer, this process migrates the entire system to the new platform, after which it is no longer active in Sunny Portal Classic. You require administrator rights in the relevant system for this.
Information: When creating a system, ensure that you enter the correct values for system size, location and PV module areas in order to obtain reliable PV forecast figures.