Activating SMA Premium via Sunny Portal


Requirements:

  • The system must be captured in Sunny Portal powered by ennexOS.
  • The System Manager must be configured.
  • An energy meter must be installed at the point of interconnection.
  • Depending on normative requirements, the limitation at the point of interconnection must be correctly set.

Procedure:

  1. Ensure that no Sunny Home Manager 2.0 is configured as a main device in the system.
  2. Make location settings. Go to [System properties] via [Configuration].
  3. Maintain the details for Location and PV system power.
  4. Activate the automatic updates of all SMA products.
  5. Go to [Energy management] via [Configuration].
  6. In the Energy Maximizer area, click the button [Test for free].
  7. You will be redirected to the SMA Online Shop.
  8. Follow the instructions in the SMA Online Shop.
  9. The free trial period has been activated.
  • SMA Premium is active and can be viewed under [Configuration] > [Digital Products]. After the trial period (90 days) has ended, SMA Premium and the associated contract conditions remain active unless you cancel SMA Premium before the end of the trial period.