Activating SMA Premium via Sunny Portal
Requirements:
- The system must be captured in Sunny Portal powered by ennexOS.
- The System Manager must be configured.
- An energy meter must be installed at the point of interconnection.
- Depending on normative requirements, the limitation at the point of interconnection must be correctly set.
Procedure:
- Ensure that no Sunny Home Manager 2.0 is configured as a main device in the system.
- Make location settings. Go to [System properties] via [Configuration].
- Maintain the details for Location and PV system power.
- Activate the automatic updates of all SMA products.
- Go to [Energy management] via [Configuration].
- In the Energy Maximizer area, click the button [Test for free].
- You will be redirected to the SMA Online Shop.
- Follow the instructions in the SMA Online Shop.
- The free trial period has been activated.
- SMA Premium is active and can be viewed under [Configuration] > [Digital Products]. After the trial period (90 days) has ended, SMA Premium and the associated contract conditions remain active unless you cancel SMA Premium before the end of the trial period.