Planning Mounting Locations


The following products within the SMA Home Energy Solution with battery-backup function impose requirements on the installation site which must be taken into account at the planning stage:

Sunny Island 4.4M / 6.0H / 8.0H with:

  • Battery

  • Battery fuse

  • Automatic transfer switching device with Sunny Home Manager 2.0

Sunny Boy Smart Energy 3.6 / 4.0 / 5.0 / 6.0 / 8.0 / 9.0 with:

  • Battery

  • Battery-backup power supply and automatic switchover device SMA Backup 1P

  • Battery-backup power supply and automatic switchover device SMA Backup 3P Kit

Sunny Tripower 5.0 / 6.0 / 8.0 / 10.0 Smart Energy with:

  • Battery

The following points should be considered as early as the planning stage:

  • The minimum clearances to walls, objects, SMA products or other technical devices must be complied with.

  • The ambient conditions at the planned deployment sites must meet the requirements the individual products place on the mounting locations.

  • The maximum cable routes and radio ranges between the listed SMA products and to other devices must be feasible.

  • The cable cross-sections and conductor materials of the planned cables must meet the requirements of the listed products.

  • The battery room must meet the requirements of the battery manufacturer.

  • Only when using the Sunny Island with a lead-acid battery: A battery fuse must be installed between the DC connection of the Sunny Island and the battery (for the requirements for the battery fuse see the inverter operating manual).

Links to additional information can be found at www.SMA‑Solar.com:

Sunny Home Manager 2.0

Operating manual

SMA Energy Meter

Installation Manual

SMA EV Charger

Operating manual

SUNNY ISLAND 4.0M / 6.0H / 8.0H

Operating manual

Sunny Boy Smart Energy 3.6 / 4.0 / 5.0 / 6.0 / 8.0 / 9.0

Operating manual

SMA Backup 1P (BU-SBSE-1P-50)

Operating manual

SMA Backup 3P Kit (BU-SBSE-3P-50)

Operating manual

SUNNY TRIPOWER 5.0 / 6.0 / 8.0 / 10.0 SMART ENERGY

Operating manual

The requirements made on the installation site of the automatic transfer switching device are listed in the manufacturer documentation of the switch cabinet and its components.

The requirements for the mounting location of the PV inverters used are listed in the manuals for the PV inverters.