PV Inverters in the SMA Energy System Home


Sunny Boy Storage or Sunny Island and other PV inverters

Operating conditions

Permitted

Sunny Island with PV inverters

  • The PV inverter must be compatible with the Sunny Home Manager.

yes

1 Sunny Boy Storage and PV inverter

  • The PV inverter must be of the type Sunny Boy or Sunny Tripower.

  • If the PV inverter is not equipped with SMA Webconnect, the Sunny Home Manager must be installed.

yes

1 Sunny Boy Storage and additional Sunny Boy Storage devices

no

1 Sunny Boy Storage and PV inverters from another manufacturer

1 Sunny Boy Storage and SMA micro inverter

  • An additional energy meter must be installed as a PV production meter.

  • The entire PV generation must be routed via the additional energy meter, otherwise no distinction can be made between PV generation and grid feed-in/purchased electricity.

    When the additional PV production meter is installed, this value is being taken as PV generation value instead of the values provided by the PV inverter.

  • The SMA Energy Meter must be used as a PV generation meter.

yes

3 EV Chargers and Sunny Home Manager

In multi-EVC operation mode, all charging stations must be connected to the utility grid on a rolling basis.

yes