Cabling plans for: BYD Battery-Box Premium HVM/HVS with BCU 2.0 and BYD Battery-Box HVB, HVM+ and HVS+ with corresponding BCU


17006963212

Cabling plan for the circuitry of Sunny Tripower Smart Energy with BYD Battery-Box Premium HVB, HVM+, HVS+. The individual cable ends must be provided with a 12 mm long bootlace ferrule.

The CAN communication cable can also be connected directly to the RJ45 socket of the battery.

16066487948

Cabling plan according to TIA-568B (a standard Ethernet cable with one open end): Sunny Tripower Smart Energy with BYD Battery-Box Premium HVM/HVS, BYD Battery-Box HVB, HVM+, HVS+. The individual cable ends must be provided with a 12 mm long wire end sleeve.

Terminal point at inverter

Function

RJ45 connector on the battery

1

CAN H (twisted pair conductors, at least CAT5e)

4

2

Enable

7

3

CAN L (twisted pair conductors, at least CAT5e)

5

4

GND

8

5

Not used

-

6

Shielding (if necessary)

-