Cabling plan with BMZ Hyperion, IBC era:powerbase or Axitec AXIstorage LI SH

Sunny Tripower Smart Energy with BMZ Hyperion, AXITEC AXIstorage, IBC era:powerbase when using the communication cable provided by the battery manufacturer. If an installation cable is not used, the individual cable ends must be provided with a 12 mm long bootlace ferrule.
Terminal point at inverter | Function | Terminal point at battery |
|---|---|---|
1 | CAN H (twisted pair conductors, at least CAT5e) | 1 |
2 | Enable | 6 |
3 | CAN L (twisted pair conductors, at least CAT5e) | 2 |
4 | GND | 5 |
5 | Not used | - |
6 | Shielding (if necessary) | - |