Cabling plan with LG RESU FLEX

Cabling plan for Sunny Tripower Smart Energy with LG RESU FLEX with installation cable. If an installation cable is not used, the individual cable ends must be provided with a 12 mm long bootlace ferrule.
Terminal point at inverter | Function | Terminal point at battery |
|---|---|---|
1 | CAN H (twisted pair conductors, at least CAT5e) | 15 |
2 | Enable | 4 |
3 | CAN L (twisted pair conductors, at least CAT5e) | 14 |
4 | GND | 1 |
5 | Not used | - |
6 | Shielding (if necessary) | - |