Activating the Receipt of Control Signals (Only for Italy)
Qualified person
In order for PV systems in Italy to receive control commands from the grid operator, set the following parameters.
The basic procedure for changing operating parameters is explained in another section ( > Changing Operating Parameters).
Parameter | Value/range | Resolution | Default |
---|---|---|---|
Application-ID | 0 to 16384 | 1 | 16384 |
Goose-Mac address | 01:0C:CD:01:00:00 to 01:0C:CD:01:02:00 | 1 | 01:0C:CD:01:00:00 |
Procedure:
- Select the parameter group External Communication > IEC 61850 configuration.
- Set the parameter IEC server switched on to Yes.
- Select the parameter group GOOSE configuration.
- Select the parameter Application-ID and enter the GOOSE application ID determined by the grid operator. 16384 is set by default. With the default value the processing of GOOSE messages is disabled. Only with a valid Application-ID the processing of GOOSE messages can be activated.
- Select the parameter Goose-Mac address and enter the MAC address of the grid operator gateway from which the inverter is to receive the control commands. You will receive this value from your grid operator.
- Select [Save all].
- Restart the inverter. For this: Switch off the DC load-break switch. Wait 5 minutes. Switch on the DC load-break switch again.
- The receipt of control signals from the grid operator is activated.