Electrical connection procedure
This section describes the procedure for the electrical connection of the product. It provides an overview of the steps, which must be performed in the prescribed sequence.
Procedure | See | |
|---|---|---|
1. | Make sure that the product is mounted according to the requirements. | |
2. | Ensure that the requirements for the electrical connection are fulfilled. | |
3. | Optional: Mount SMA Backup for Sunny Tripower Hybrid X | Manual for Backup Box |
4. | Connect the inverter to the utility grid. | |
5. | Connect external protective grounding. | |
6. | Connect the network cables. | |
8. | Optional: Connect the battery communication cable. | ( > Connecting the Battery Communication for SMA Home Storage and SMA Storage M) |
9. | Optional: Connect the battery power cable. | |
10. | Optional: Connect signal source for active power limitation | |
11. | Optional: Connect signal source to multifunction relay (MFR). | |
12. | Optional: Connect signal source for fast stop. | Connection for Digital Fast-Stop Inputs |
13. | Optional: Connect signal source for backup operation. | |
14. | Connect the PV modules. | |
Also see:
- Mounting
- Connecting the Inverter to the Utility Grid
- Connecting the external protective grounding
- Connecting the Network Cables
- Connecting the PV Array
- Connecting the power cable of the battery
- Connecting the Battery Communication for SMA Home Storage and SMA Storage M
- Connection for Active Power Limitation
- Connection to the Multifunction Relay
- Connection for Backup Operation
- Requirements for the electrical connection