Configuration SHP FLEX-US


Qualified person

The SHP FLEX-US can be flexibly adjusted in terms of power and AC voltage and current. As a result, the SHP FLEX-US can be optimized for repowering purposes and used variably.

After commissioning the SHP FLEX-US, the following parameters must be set so that the product can be used as a replacement for existing devices.

If the grid protection limits have already been configured using a country data set or beyond, this does not have to be done again. The product works with standardized values based on the respectively set nominal voltage or the set maximum current.

If the country data set is changed or set again after configuring the following parameters, the Nominal system voltage parameter must be set again.

If required by the grid operator, there is the option of having the parameters for apparent and active power limitation locked by Service via remote access. To do this, a suitable connection with external access to the grid must exist. Further information is available from Service.

AC voltage

Name

Value to be set

Inverter nominal voltage

Nominal voltage (RMS, line conductor-line conductor) of the system

Nominal system voltage

Nominal voltage (RMS, line conductor-line conductor) of the system

AC current

Name

Value to be set

AC current limitation

Maximum current of the AC output

AC power

Name

Value to be set

Nominal apparent power VAMaxOut

Maximum apparent power of the AC output

Set active power limit

Maximum active power of the AC output

Nominal reactive power VArMaxQ1

Maximum reactive power of the AC output

Nominal reactive power VArMaxQ4

Maximum reactive power of the AC output

Further parameters

Name

Value to be set

Minimum voltage input

PV voltage to start the feed-in operation.

Formula: AC voltage x 1.55

Critical voltage to end feed-in

Minimum PV voltage to which the MPP tracker tracks down.

Formula: AC voltage x 1.4

Disconnection limit for leakage current

Disconnection threshold for the leakage current.

Formula: Set power in kW / 100

Disconnection limit for the lagging component of the leakage current

Disconnection threshold for the lagging component of the leakage current. Should be set to the same values as Disconnection limit for leakage current

    Also see: