Configuration Procedure


Once you have commissioned the inverter, you may have to adjust various settings via the rotary switches in the inverter or via a communication product. This section describes the procedure for configuration and gives an overview of the steps you must perform in the prescribed order.

Procedure

See

If the display language is not set correctly, adjust the settings.

Changing the Display Language

In order to use the Webconnect function, integrate the inverter into the network.

Integrating the Inverter into the Network

To manage the PV system data or to set the inverter parameters, capture the inverter in a communication product.

Manual of the communication product at www.SMA-Solar.com

In order to receive control commands of the grid operator via SMA Speedwire/Webconnect for PV systems in Italy, set the parameters.

Manual of the Speedwire/Webconnect interface

Change the system time and system password.

Manual of the communication product at www.SMA-Solar.com

If the inverter is installed in an IT network or another grid configuration where deactivation of the grounding conductor monitoring is required, deactivate the grounding conductor monitoring.

Deactivating Grounding Conductor Monitoring

For partially shaded PV modules and depending on the given shading situation, you should set the interval at which the inverter optimizes the MPP of the PV system.

Setting SMA OptiTrac Global Peak