Overview of the Connection Area

Position | Designation |
|---|---|
A, B, C | Connection for the AC cable for the connection on the inverter |
D | Connection for the AC cable SPS IN |
E | Connection for the AC cable SPS OUT |
F, G | Connection for the AC cable for backup loads |
H, I, J | Connection for the AC cable for the utility grid |
K | 6 A pre-fusing of the monitoring relay |
L | optional connection for the grounding cable |
M | 32 A miniature circuit breaker to protect the cable to the inverter |