Switchover times (adjustable parameters)
Interruption of load supply during the transition from automatic backup to feed-in operation | 1 s to 60 s (default: 5 s) |
Minimum duration of grid fault for start of automatic backup operation | 1 s to 600 s (default: 2 s) |