System Requirements
- A device (e.g. Data Manager M, Sunny Boy Smart Energy, Sunny Tripower Hybrid X, Sunny Tripower X 25, Sunny Tripower X 60, Sunny Tripower Storage X, Sunny Island X, eCharger) must be registered and configured as the System Manager.
- The system must be captured in Sunny Portal powered by ennexOS.
- The System Manager must be configured.
- No Sunny Home Manager 2.0 can be configured as a main device in the system.
- An energy meter must be installed at the point of interconnection.
- Depending on normative requirements, the limitation at the point of interconnection must be correctly set.
- The system must be configured with self-consumption.