Procedure for the Initial Installation and Commissioning of the System


The procedure for installation, electrical connection, and commissioning of the system is described in the following. It provides an overview of the steps, which must be performed in the prescribed sequence.

Procedure

See

Ensure that the requirements for the installation of the system components are fulfilled.

Manuals of the system components

Mount the inverter.

Manual of the inverter

Mount backup solution.

Manual of the backup solution

Install the SMA Energy Meter or Sunny Home Manager.

Manual of the SMA Energy Meter or Sunny Home Manager

Mount the battery.

Manual for the battery

Ensure that the requirements for the electrical connection are fulfilled.

Manuals of the system components

Connect to utility grid.

Manual of the inverter

Connect the inverter to the backup solution.

Manual of the backup solution

Connect backup loads to the backup solution.

Manual of the inverter

Connect the network cables to the router and other inverters to the inverter.

Manual of the inverter

Connect SMA Energy Meter or Sunny Home Manager to the inverter.

Manual of the inverter

Connect the data cables of the battery.

Manual of the inverter

Connect switch for fast stop to digital input (optional).

Manual of the inverter

Connect to the multifunction relay (optional).

Manual of the inverter

Connect the PV modules to the inverter.

Manual of the inverter

Connect the battery power cables.

Manual of the inverter

Connect the additional grounding to the inverter.

Manual of the inverter

Commission the system.

Manual of the inverter

Make additional settings.

Manual of the inverter

Test backup operation.

Manual of the inverter