Configuration of SG Ready interface
The product allows to control devices with an SG-ready interface (e.g. heat pumps) via digital outputs of connected I/O systems.
SG Ready has four switching states that are transferred via two binary digital signals:
10: Blocked operation
00: Energy-efficient normal operation
01: Encouraged operation
11: Ordered operation
At minimum, the heat pump must support the following operating states: 10: Blocked operation, as well as either 01: Encouraged operation or 11: Ordered operation.