Configuration of SG Ready interface


The product allows to control devices with an SG-ready interface (e.g. heat pumps) via digital outputs of connected I/O systems.

SG Ready has four switching states that are transferred via two binary digital signals:

  1. 10: Blocked operation

  2. 00: Energy-efficient normal operation

  3. 01: Encouraged operation

  4. 11: Ordered operation

At minimum, the heat pump must support the following operating states: 10: Blocked operation, as well as either 01: Encouraged operation or 11: Ordered operation.