Cabling plans for: BYD Battery-Box HVB, HVM+ and HVS+ with corresponding BCU


With BYD batteries, the battery communication can take place via the Multi I/O interface or via an RJ45 interface. SMA Solar Technology AG recommends wiring of the BYD batteries via the Multi I/O. Check prior to installation which communication interface is needed for the battery used. Note the required pin assignment for each communication interface. Incorrect interface selection or pin assignment can result in communication errors or failed commissioning.

16815420172

Cabling plan for the circuitry of Sunny Tripower Hybrid X with BYD Battery-Box HVB, HVM+ and HVS+.

Pin at the MULTI I/O inverter

Signal

Terminal point at battery

11

CAN_H

8

12

CAN_L

7

13

EN_GND

3

14

BAT_EN

4

15

"Do not use"

-

17101951884

Cabling plan: Sunny Tripower Hybrid X with BYD Battery-Box HVB, HVM+ and HVS+.

Pin at the RJ45 connector on the inverter

Signal

RJ45 connector on the battery

2

EN_GND

8

4

CAN_H

4

5

CAN_L

5

7

BAT_EN

7