Cabling plans for: BYD Battery-Box HVB, HVM+ and HVS+ with corresponding BCU

Cabling plan for the circuitry of Sunny Tripower Hybrid X with BYD Battery-Box HVB, HVM+ and HVS+. The individual cable ends must be provided with a 12 mm long bootlace ferrule.
Pin at the MULTI I/O inverter | Signal | Terminal point at battery |
|---|---|---|
11 | CAN_H | 8 |
12 | CAN_L | 7 |
13 | EN_GND | 4 |
14 | BAT_EN | 3 |
15 | "Do not use" | - |

Cabling plan according to the TIA-568B standard (a standard Ethernet cable): Sunny Tripower Hybrid X with BYD Battery-Box HVB, HVM+ and HVS+.
Pin at the RJ45 connector on the inverter | Signal | RJ45 connector on the battery |
|---|---|---|
2 | EN_GND | 8 |
4 | CAN_H | 4 |
5 | CAN_L | 5 |
7 | BAT_EN | 7 |