Cabling plans for: BYD Battery-Box HVB, HVM+ and HVS+ with corresponding BCU


16815420172

Cabling plan for the circuitry of Sunny Tripower Hybrid X with BYD Battery-Box HVB, HVM+ and HVS+. The individual cable ends must be provided with a 12 mm long bootlace ferrule.

Pin at the MULTI I/O inverter

Signal

Terminal point at battery

11

CAN_H

8

12

CAN_L

7

13

EN_GND

4

14

BAT_EN

3

15

"Do not use"

-

17101951884

Cabling plan according to the TIA-568B standard (a standard Ethernet cable): Sunny Tripower Hybrid X with BYD Battery-Box HVB, HVM+ and HVS+.

Pin at the RJ45 connector on the inverter

Signal

RJ45 connector on the battery

2

EN_GND

8

4

CAN_H

4

5

CAN_L

5

7

BAT_EN

7