Commissioning Procedure
Qualified person
Procedure | See | |
---|---|---|
Commission each inverter. | ||
Establish a connection to the user interface of an inverter. The following connection options are available to choose from:
| ||
Log into the user interface. | ||
Configure the inverter using the installation assistant. | ||
Save the configuration of the inverter in a file. | ||
Establish a connection to the user interface of each additional inverter in the system. | ||
Log into the user interface of each additional inverter. | ||
Configure each additional inverter using the configuration file of the first inverter. | ||
To monitor the PV system and visualize the PV system data, register in the Sunny Portal and create the system in Sunny Portal or add devices to an existing system. | https://ennexos.sunnyportal.com or https://www.sunnyportal.com |