Cabling Plan with Battery-Box Premium HVS/HVM and BCU 2.0


The bridge at the GSI terminal must be inserted during operation.

Upon delivery of the Sunny Boy Smart Energy, there is a jumper wire on the GSI terminal block. This jumper wire must be removed when a switch for the fast stop is connected. Once the jumper wire has been removed and no switch is connected, operation with a battery is no longer possible.

16054003980

Cabling plan Sunny Boy Smart Energy with Battery-Box Premium HVS/HVM and BCU 2.0

Pin at the RJ45 connector on the inverter

Signal

RJ45 connector on the battery

1

-

-

2

EN_GND

8

3

-

-

4

CAN_H

4

5

CAN_L

5

6

-

-

7

BAT_EN

7

8

-

-