Cabling plan with Pylontech Force H3


The bridge at the GSI terminal must be inserted during operation.

Upon delivery of the Sunny Boy Smart Energy, there is a jumper wire on the GSI terminal block. This jumper wire must be removed when a switch for the fast stop is connected. Once the jumper wire has been removed and no switch is connected, operation with a battery is no longer possible.

Pins 1 and 2 at the battery terminal point must be bridged.

15975904780

Pin at the RJ45 connector on the inverter

Signal

Terminal point at battery

1

EN_GND

7

2

EN_GND

3

3

-

-

4

CAN_H

4

5

CAN_L

5

6

-

-

7

BAT_EN

6

8

-

-